Administrative building
|
General view of boiler house |

Production premises
|
|
 |
Plywood manufacture |
Installation site of the wood waste boiler before assembly
|

Boiler installation works |
|
|
Implementation of superheated steam boiler 15 MW in very narrow condition of existing boiler house |

Common view of turbine hall construction |

Fuel Feeder |
Testing of the fuel reload unit from the load chamber to fuel conveying line
|
>
Boiler |
Turbine and generator installation
|
Exhaust refinning unit |
Turbine |
Central dispatching office
|
Works at the electric power substation of the cogeneration plant |
|